Your guide to sub-meter surveys with Stark 

Our data-first mindset extends to our sub-metering surveys.

We need to understand why you need sub-meters – your data expectations and how you intend to use the data – so we can provide the best sub-meter options to help you achieve your results.

Here, we explain how a survey is conducted and detail some of the key information we need.

1. Defining the Scope: Pre-survey Questions

Why are you installing sub-meters? This is the first question we ask. You must understand why you need sub-metering, so we can recommend the most suitable solutions.

There are TWO main reasons energy managers install sub-meters:

  • Energy management: Obtaining enhanced, granular data to pinpoint efficiencies and improvements across your building or estate.
  • Tenant recharging: Providing accurate consumption data to commercial tenants to recoup utility costs from them.

Once we know why you want the sub-metering, we will need to understand your building.

This information is essential to a successful sub-metering survey – you may not know all of the answers, but it’s very important to consider these ahead of any site visit.

  • Detailed Meter List: Tell us where your main and any existing sub-meters are located, and they can be locally isolated
  • Power downs: We need to know all areas where you cannot have disruptions to service/power.
  • Scheduled Maintenance: If you have any pre-planned maintenance for any areas or equipment we will be working with, let us know
  • Access requirements: Keys, codes, entry forms, security or tool permits – ensure we have what we need to gain access to meter and switch room locations.
  • Existing equipment: We will integrate the existing sub-metering kit where it makes sense to do so, to save your costs.

The top 3 things we need to perform a successful site survey are: Access to site, a detailed meter point list and what operational areas are critical or sensitive to power shutdowns.

Tom HallLead Sub-meter Engineer

2. Surveying your site

Site Survey

We schedule site visits from our team in Blackpool and will coordinate with you to make sure it’s at a suitable time.

No power shutdowns happen during a survey.

During a survey, our engineer will take detailed notes to ensure a smooth installation phase. Often, a different engineer will install the sub-meters, so the report needs to communicate all the information they will need.

  • Meter Locations
  • Meter Point Name
  • Hardware required (Whole Current (WC) or Current Transformer (CT)
  • Power Down required
  • Signal Strength
  • Photos

Desktop Survey

We may be able to perform a desktop survey and not attend the site if your project is small and not complex.

You will need to provide us with the photos, and we will guide you on what we need to see.

3. Quotation

We will provide a quotation based on the site survey or desktop survey for your consideration. Your account manager or one of our engineers will take you through and answer any questions you may have.

You will then be able to accept the quote, sign the contract and then proceed with the installation and data collection.

Ready to enhance your energy management data with sub-metering?

FAQs: Sub-meter surveys

Will I need power downs during the survey?

No. During the survey we are observing and making notes.

Does your engineer need to be escorted?

Ideally yes. We need to ensure access to the meter locations, and we can discuss the work and answer your questions at the same time

What's the main reason surveys don't go smoothly?

Access to site – making sure people know to expect our engineer and ensure meter locations are accessible is half the battle!

I can't have the power switched off for certain areas - how can you help?

We often deal with customers who have power-sensitive operations and will avoid power shutdowns where possible or suggest alternatives.

What if there's no mobile network signal at my meter points?

Our engineer will test the signal strength, and if there is none, we will suggest alternative communication methods for those sub-meter points.

Will the quotation include day+1 data collection?

Yes. Remote data collection is vital to make a change to your energy consumption, so yes, our sub-metering quotation will include the data collection and access to the Stark ID energy analytics platform as standard.

Will the quotation include maintenance?

Yes. We provide maintenance for your sub-meters and it will be included in the quotation.

Don’t miss out

Stay in the loop with our news, events and more direct to your inbox

Please use your work email address. We don't accept Gmail, Hotmail, Yahoo or other personal email domains.

Stark sub-meter data

Learn more

Stark sub-meter installation

Go to page

Home » Energy manager’s guide to sub-metering surveys

Stark